BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//PSD - ECPv6.15.11//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:PSD
X-ORIGINAL-URL:https://psdconsulting.com
X-WR-CALDESC:Events for PSD
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20220313T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20221106T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20230312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20231105T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20230927T140500
DTEND;TZID=America/New_York:20230927T150500
DTSTAMP:20260429T020451
CREATED:20230726T203539Z
LAST-MODIFIED:20230726T204704Z
UID:20624-1695823500-1695827100@psdconsulting.com
SUMMARY:C7.1 - Building Systems Commissioning: Saving Money and Meeting Code
DESCRIPTION:Make sure to use the GoToWebinar link to obtain video access\, this is required and verified for CEU credit. VIDEO VIEWING IS REQUIRED! \nCEU’s: 1 CSL (Code Review)\, 1 AIA\, 1 BPI\, 1 Code Official \nCommercial Webinar – Building Systems Commissioning: Saving Money and Meeting Code \nCOURSE DESCRIPTION:\nBuilding commissioning reduces energy bills\, improves comfort\, reduces CO2 and other emissions\, and… it is the law. According to data from US Energy Information Administration (EIA)\, in 2018 commercial buildings accounted for over 18% of the energy consumed in the US\, with over half that energy dedicated to heating\, cooling\, and lighting. While most building owners and builders understand the importance of high-efficacy lighting and efficient HVAC systems\, the importance of building system commissioning is less widely appreciated. Studies have shown that the operating efficiency of commercial buildings improves by as much as 13% with commissioning.\nThis course will provide an overview of mechanical systems and lighting commissioning including the benefits to building owners and occupants\, the general commissioning process\, and a review of energy code requirements and associated documentation. The course will also identify the roles that building owners\, builders\, code officials\, and commissioning agents play in the commissioning process and highlight relevant industry standards and certifications. \nLEARNING OBJECTIVES:\nAttendees will be able to…\n1. Describe the code requirements for building systems commissioning.\n2. Understand the different phases of the commissioning process.\n3. Identify the roles of building owners\, commissioning providers\, builders\, and building code officials.\n4. Provide and review the required commissioning documentation.
URL:https://psdconsulting.com/calendar/c7-1-building-systems-commissioning-saving-money-and-meeting-code-6/
LOCATION:ONLINE – WEBINAR
CATEGORIES:Commercial
ATTACH;FMTTYPE=image/jpeg:https://psdconsulting.com/wp-content/uploads/2023/07/mass-save-logo2.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20251105T123000
DTEND;TZID=America/New_York:20251105T140000
DTSTAMP:20260429T020451
CREATED:20251003T155733Z
LAST-MODIFIED:20251003T155733Z
UID:23006-1762345800-1762351200@psdconsulting.com
SUMMARY:C5.1 - The Energy Code and Existing Buildings (Commercial) - Part 1
DESCRIPTION:C5.1 – The Energy Code and Existing Buildings (Commercial) – Part 1 \nT02-07-3163 \nCOURSE DESCRIPTION: This course will provide a review of IECC Chapter 5 [CE] provisions with an emphasis on situations where work performed on existing buildings requires them to meet the energy code like new construction. This includes additions\, new thermal envelope assemblies built as part of an alteration\, window replacements\, new heating\, cooling and duct systems\, new service hot water systems\, new lighting where 10 percent or more of the luminaires are replaced\, changes from unconditioned to conditioned space\, and commercial spaces converted to dwelling units. The course will provide numerous examples and ask attendees to identify the energy code requirements for each scenario. \nLEARNING OBJECTIVES: \n1- Determine when construction in existing buildings needs to meet the energy code like new construction \n2- Determine situations where exception apply \n3- Understand various prescriptive energy code requirements for existing building projects requiring compliance like new construction \n4- Describe documentation necessary to take the historic buildings exemption \n 
URL:https://psdconsulting.com/calendar/c5-1-the-energy-code-and-existing-buildings-commercial-part-1-8/
CATEGORIES:Commercial,Commercial
ATTACH;FMTTYPE=image/png:https://psdconsulting.com/wp-content/uploads/2023/01/new-york.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20251105T141500
DTEND;TZID=America/New_York:20251105T154500
DTSTAMP:20260429T020451
CREATED:20251003T160857Z
LAST-MODIFIED:20251003T160857Z
UID:23008-1762352100-1762357500@psdconsulting.com
SUMMARY:C5.2 - The Energy Code and Existing Buildings (Commercial) - Part 2
DESCRIPTION:C5.2 – The Energy Code and Existing Buildings (Commercial) – Part 2 \nT02-07-3164 \nCOURSE DESCRIPTION: This course will provide a review of IECC Chapter 5 [CE] provisions with an emphasis on situations where work performed on existing buildings requires them to meet the energy code like new construction. This includes additions\, new thermal envelope assemblies built as part of an alteration\, window replacements\, new heating\, cooling and duct systems\, new service hot water systems\, new lighting where 10 percent or more of the luminaires are replaced\, changes from unconditioned to conditioned space\, and commercial spaces converted to dwelling units. The course will provide numerous examples and ask attendees to identify the energy code requirements for each scenario. \nLEARNING OBJECTIVES: \n1- Determine when construction in existing buildings needs to meet the energy code like new construction \n2- Determine situations where exception apply \n3- Understand various prescriptive energy code requirements for existing building projects requiring compliance like new construction \n4- Describe documentation necessary to take the historic buildings exemption
URL:https://psdconsulting.com/calendar/c5-2-the-energy-code-and-existing-buildings-commercial-part-2-8/
CATEGORIES:Commercial,Commercial
ATTACH;FMTTYPE=image/png:https://psdconsulting.com/wp-content/uploads/2023/01/new-york.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20251112T123000
DTEND;TZID=America/New_York:20251112T140000
DTSTAMP:20260429T020451
CREATED:20251003T162212Z
LAST-MODIFIED:20251003T162419Z
UID:23014-1762950600-1762956000@psdconsulting.com
SUMMARY:C4.1- Electrifying the Energy Code- Part 1
DESCRIPTION:C4.1- Electrifying the Energy Code- Part 1 \nT02-07-3134 \nCOURSE DESCRIPTION: The first part of the program will cover IECC Appendix CA: Solar-Ready Zone along with related requirements including mandatory access and set back areas required by the Fire Code of New York State in Section 1204 Solar Photovoltaic Power Systems. This section will also discuss what it means to include a “collateral dead load” in gravity and lateral design calculations for the roof.
URL:https://psdconsulting.com/calendar/c4-1-electrifying-the-energy-code-part-1/
CATEGORIES:Commercial,Commercial
ATTACH;FMTTYPE=image/png:https://psdconsulting.com/wp-content/uploads/2023/01/new-york.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20251112T141500
DTEND;TZID=America/New_York:20251112T154500
DTSTAMP:20260429T020451
CREATED:20251003T162854Z
LAST-MODIFIED:20251003T162854Z
UID:23016-1762956900-1762962300@psdconsulting.com
SUMMARY:C4.2- Electrifying the Energy Code- Part 2
DESCRIPTION:C4.2- Electrifying the Energy Code- Part 2 \nT02-07-3141 \nCOURSE DESCRIPTION: The second part of the program will cover the EV Charging Station Capable requirements and provide detailed coverage of the five additional power distribution packages in NYStretch Appendix CC. A particular emphasis will be placed on how to accomplish the requirements for the more complex packages\, including electrical energy monitoring and interoperable automated demand-response.
URL:https://psdconsulting.com/calendar/c4-2-electrifying-the-energy-code-part-2/
CATEGORIES:Commercial,Commercial
ATTACH;FMTTYPE=image/png:https://psdconsulting.com/wp-content/uploads/2023/01/new-york.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20251125T123000
DTEND;TZID=America/New_York:20251125T140000
DTSTAMP:20260429T020451
CREATED:20251003T173256Z
LAST-MODIFIED:20251003T173256Z
UID:23023-1764073800-1764079200@psdconsulting.com
SUMMARY:C6.1 - Foam without Flames – Part 1 – Thermal Bridging
DESCRIPTION:C6.1 – Foam without Flames – Part 1 – Thermal Bridging \nT02-07-3230 \nCOURSE DESCRIPTION Reducing thermal bridging is one of the keys to reducing energy waste in buildings and\, to that end\, the prescriptive energy code contains requirements for continuous insulation for roofs\, above-and below-grade walls\, and mass floors. This program will provide an overview of the thermal envelope requirements in the ECCCNYS [CE] and NYStretch [CE] as they relate to continuous insulation. This will be followed by a discussion the types of construction as categorized by the Building Code of New York State (Types I\, II\, III\, IV\, V) and associated fire-resistance rating requirements and fire separation distance requirements\, and NFPA 285 test for vertical and lateral flame spread as they relate to exterior foam applications.
URL:https://psdconsulting.com/calendar/c6-1-foam-without-flames-part-1-thermal-bridging-3/
CATEGORIES:Commercial,Commercial,New York Energy Code Training
ATTACH;FMTTYPE=image/png:https://psdconsulting.com/wp-content/uploads/2023/01/new-york.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20251125T141500
DTEND;TZID=America/New_York:20251125T154500
DTSTAMP:20260429T020451
CREATED:20251003T173626Z
LAST-MODIFIED:20251003T173626Z
UID:23025-1764080100-1764085500@psdconsulting.com
SUMMARY:C6.2 - Foam without Flames – Part 2 – Fire Rated Assemblies
DESCRIPTION:C6.2 – Foam without Flames – Part 2 – Fire Rated Assemblies \nT02-07-3237 \nCOURSE DESCRIPTION: Reducing thermal bridging is one of the keys to reducing energy waste in buildings and\, to that end\, the prescriptive energy code contains requirements for continuous insulation for roofs\, above-and below-grade walls\, and mass floors. This program will provide an overview of the thermal envelope requirements in the ECCCNYS [CE] and NYStretch [CE] as they relate to continuous insulation. This will be followed by a discussion the types of construction as categorized by the Building Code of New York State (Types I\, II\, III\, IV\, V) and associated fire-resistance rating requirements and fire separation distance requirements\, and NFPA 285 test for vertical and lateral flame spread as they relate to exterior foam applications.
URL:https://psdconsulting.com/calendar/c6-2-foam-without-flames-part-2-fire-rated-assemblies-3/
CATEGORIES:Commercial,Commercial,New York Energy Code Training
ATTACH;FMTTYPE=image/png:https://psdconsulting.com/wp-content/uploads/2023/01/new-york.png
END:VEVENT
END:VCALENDAR